BRIDGEWATER OWNERS ASSOCIATION
EXTERIOR REPAIRS RECONSTRUCTION
PROJECT UPDATE
December 7, 2022
WORK IN PROGRESS: The repairs at Building 4 have crested around the back of the building and are underway along the east alley elevation. Framing repairs at this elevation continue, with replacement of decayed exterior sheathing and building paper, and repairs to balcony railings. All opened areas are evaluated by the Architect and I-Beam before any directed repairs are made, then the new Blueskin weather barrier is installed before the new windows/sliding glass doors and all siding and trims are installed. New siding/trims have been completed at ¾ of the North and West Courtyard elevations, where window/door installations have been completed, and siding/trim will continue being installed around the building in a counterclockwise fashion after the Blueskin has been installed.
STORAGE CLOSETS: Once scaffolding has been erected access to your unit storage closets will be restricted as the balconies and patios will become construction zones and unsafe for residents. AS SUCH, WE ENCOURAGE RESIDENTS TO REMOVE PERSONAL ITEMS FROM STORAGE CLOSETS BEFORE CONSTRUCTION STARTS AT YOUR BUILDING ELEVATION. This includes any items you need access to on a regular basis OR those which you do not want the construction crew to have access to - should they need to open your closet for any reason (to replace your closet door if needed, to waterproof around your existing door should they not be able to with the door closed/locked, etc. or for any other reason related to the construction). Thank you for your understanding.
NEW WINDOWS & DOORS: ACE has taken delivery of the first several batches of new windows and doors, and is completing installations at all units in the NW quadrant of Building 4. Additional deliveries are scheduled right before and right after Christmas, with another 7 deliveries expected in January 2023. Installations are being scheduled around the building in a counterclockwise fashion. Once ACE completes all installations in the courtyard-facing units, they will round the building at the south end, then start at the alley-facing units on the south end of the building, and work their way up to north end of the building.
Bloomin Blinds of Contra Costa & Alameda Counties
Thomas Gowans, (925) 437-7879, tom.gowans@bloominblinds.com
PLEASE NOTE - CUSTOM PAINT
COLORS WILL NOT BE MATCHED
Repairs may entail sealing any gaps/separations, then painting the window walls where damage needs to be touched up, and not more than "corner-to-corner" back to the Developer's original paint color/s. The contractor has not been contracted to match to custom colors, so residents with custom paint/colors on window walls will need to supply their own paint. Neither ACE nor the Association will reimburse unit owners the cost to match custom paint. Likewise, the contractor is not contracted to paint different colors over existing colors, as this requires additional preparation, more paint, and is more costly. Residents wishing a paint color change should consult a local painting contractor to obtain a paint quote for any additional painting work desired.
PROJECT SCHEDULES: PROJECT SCHEDULES: As a reminder, all Project schedules will be posted at the kiosk located in the courtyard on the east side of the construction yard – this includes current 2-Week Look Ahead Schedules for Building 4 and Building 3 thru 12/23/2022. Building-specific schedules will be posted in each building and on each unit door when work requires it; and schedules relevant to all buildings will be posted in each elevator. Schedules will be updated periodically throughout the project as required. The Master Schedule for the entire project has also been updated and can be downloaded by clicking the link below or by hovering your mobile phone camera over the QR code in the sidebar above: Bridgewater Condos - Construction Schedule REV 10.18.2022.
QUESTIONS or CONCERNS:
If you have ANY questions, please direct them to I-Beam's Construction Concierge team: Sr. Project Manager Chris Alcorn and Project Manager Anthony Azamar. You may call I-Beam's Concierge hotline ANYTIME day or night and Chris, Anthony, or the on-call Concierge will return your call during business hours. Your questions and concerns are important to us, so we will endeavor to respond within 24-hours or less:
I-BEAM CONSTRUCTION CONCIERGE
Toll Free at 1-866-620-8880x1, 415-324-8806, or 415-325-5799
bridgewater@ibeamsf.com - chris@ibeamsf.com - anthony@ibeamsf.com
Project information and updates can also be accessed via
I-Beam's Construction Concierge Project Blog site:
BRIDGEWATER PROJECT BLOGSITE:
Thank You!
I-Beam Reconstruction Management, Inc.